ciputra world office tower 2 new launch
Ciputra world office tower 2 new launch. With the success of DBS bank tower at Ciputra world 1 jakarta the additional 47 skyscraper office tower is soon to be launched, with target completion in Q1 2018.
This office tower also offers ownership opportunity with an attractive investment. Strata titled office space will occupy the low zone of the building, whilst the mid and high zone of the building will be occupied by leased tenants.
Untuk pembelian unit kantor/ office, contact marketing : edyzen handphone or Whatsapp 0811192961 , 087881531238
Ciputra world office tower 2 project fact
Building size : kurang lebih 70,000 sqm (SGA)
No of floor : 47
3 basement : parking lantai
GF and 16th – 54th floor : office floors
2nd lantai : lobby
2nd and 3rd fl : banking hall dan mezzanine floor for offices
1st – 15th floor : shopping center n parking
Zoning :
Low zone : 16th – 27th floor ( 11 lantai ) , 6 lifts
Mid zone : 28th – 45 th floor ( 15 floor ) , 6 lifts
High zone : 46th – 54th ( 9 floor) , 6 lifts
Typical floor : +- 1,800 sqm semi gross
Executive : 1 lift
Servise dan parking : masing – masing 2 lifts
Car parking : 1,000 lots ( basement 1-3 , dan podium parking L8 – L12 )
Ratio of 1 lot : 70 sqm semigross
Air condition : VRV system with 6 zones
Ciputra world office tower 2 Grade A
As part of the mega development which designed by the world renown architect RTKL , this 47 floors office tower will possess high quality building infrastructure. Located in jakarta golden triangle , easily reach from all the city’s key business location with many access and free of 3 in 1 restrictions. Following the steps of DBS Bank Tower , this office tower 2 will also professionally managed by profesional building management. Which surely strengthen Ciputra World 1 Jakarta’s establishment as the premier business address in the capital city
Ciputra world office tower 2 environmental and social conscience
This upcoming 47 floor office tower is designed in accordance to green building gold certification standards , including but not limited to high efficiency double glazed facade, green coded ceiling acoutic tiles, green coded plasterboard, low emissivity paints , low water usage water basin taps, and passenger lift systems using the latest destination control technology
Ciputra world office tower 2 high performance buildings
Foundation : reinforced concrete
Superstructure
Reinforced concrete structural frame
External covering
Double glass curtain wall with laminated with back mullion cladding in complience to green building standrad.
Ciputra world office tower 2 infrastructure and technology system
IT main infrastructure and features :
Fiber optic backbone , WiFi / hotspot at curtain areas , broadband high speed internet access for office units.
Building automation system : integrated computerized system for central alarm, fire protection, CCTV , AC
Telephone line : non Pabx system with double network back up to ensure connectivity.
Elevators : Port system technology : passenger lift and lift zoning ( Low , mid , high zones ).
Fire safety : Automatic sprinklers, fire hydrants, smoke and heat detectors , fire hoses, and extinguisher, alarm for all floors. Emergency exit with pressurizing fans.
Electrical n back up power : 100% genset powered back up.
Building security provisions : 24 hours security, CCTV , car arrival checking at the perimeter of bomb checking points, boom gates / barriers and monitored by CCTV.
Entry to the office tower pass through metal detector barriers from any entry point.
Access to passenger lifts is proximity card access controlled via electronic card readers.
ID control in exchange for electronic proximity visitor card to allow access to the designated floor.
Window bomb blast film applied to the main lobby floor tempered glass curtain wall.
Ciputra world office tower 2 : international tenants i.e finance , banking, consultant , supporting business, etc.